Incoming medical caster inspection helps buyers establish whether a delivered shipment matches the approved purchase order. It is a receiving control, not a substitute for equipment validation or a certification test. For hospital bed, trolley and medical equipment projects, agree the receiving checklist before the first production delivery so that purchasing, quality and engineering teams use the same reference.
Start with the approved configuration
Keep the purchase order, supplier quotation, controlled drawing and approved sample record together. Identify the exact caster configuration, including the mounting connection and required brake function. A series name or wheel photograph may not distinguish every option. If the order contains several configurations, list each one separately and preserve the supplier’s packaging identification until receiving checks are complete.
This step differs from preparing an RFQ checklist: the receiving team compares an actual delivery with an agreed requirement. It should not create a new requirement after goods arrive or treat an undocumented substitution as equivalent.
Check the shipment before mixing stock
Count the packages and compare the packing list with the delivery. Record the item identification, quantity and any batch or lot information provided. Note missing labels, unexpected mixed contents and visible transport damage. Keep photographs of discrepancies linked to the receiving record rather than relying on an email description that may become separated from the order.
Follow your organisation’s agreed inspection and sampling procedure. The number of units checked and the treatment of discrepancies should come from that procedure and the purchasing agreement; this article does not prescribe a sampling size or an acceptance quality limit.

Use a practical receiving record
| Check | Reference | What to record |
|---|---|---|
| Identity and quantity | Order and packing list | Item, configuration, count and supplied batch reference |
| Visible condition | Agreed appearance criteria | Damage, contamination, missing parts or unresolved differences |
| Selected dimensions | Controlled drawing | Feature checked, method, result and drawing tolerance |
| Operating functions | Approved procedure | Required positions and observed behaviour |
| Documents | Purchase agreement | Required records received, revision and missing information |
| Disposition | Internal quality process | Release, hold or other authorised decision and reviewer |
Compare dimensions with a controlled drawing
Check the connection features specified for receiving inspection using suitable measuring equipment and the agreed method. Compare results with the drawing’s stated dimensions and tolerances. Do not invent a universal allowable difference for every caster. Record which feature was measured, the drawing revision and any uncertainty that needs review.
For connection details, refer to the mounting measurement checklist. Receiving measurements alone do not approve interchangeability with another model or authorise a change to the equipment design.
Separate basic checks from application approval
Where your procedure calls for operating checks, identify which movement each brake or directional setting is intended to restrain. Use the supplier’s instructions and the responsible engineering team’s approved method. Avoid forcing a locked wheel to move as an informal demonstration. A basic incoming check does not establish performance under every load, floor, cleaning process or equipment configuration.
Blickle’s manufacturer guidance treats the wheel, bracket, brake and axle options as a functional unit and identifies proper installation and intended use as important conditions. That guidance supports asking configuration-specific questions; it is not a test report or approval for a DYU caster. Review relevant operating limits with the actual supplier.
Close discrepancies before releasing the delivery
Identify affected goods and follow your internal hold process when a result cannot be reconciled with the order. Send the supplier a concise record containing the item reference, drawing revision, observed difference and photographs or measurements where relevant. Record the authorised resolution. Keep missing documents visible as open items rather than assuming a marketing brochure satisfies an order-specific evidence request.
For a new project, compare the appropriate central locking caster series or double wheel caster range, then send DYU your drawing and receiving requirements. Agree model-specific checks and documentation with your purchasing and engineering teams before ordering.
Prepared with AI assistance, 20 November 2026. General reference: Blickle product safety guidance. Cover photo: Jakub Żerdzicki / Unsplash. Illustrative photographs used under the Unsplash License.